After the research of Xinxiang Great Wall Machinery Industry Waste Residue Powder Research Center, CHAENG can provide 200,000-1,500,000t/a nickel slag production line project.
Materials: Nickel Slag
Main Equipment: GRMSS Slag Vertical Mill
Matching Equipment: belt feeder + vibrating screen + slag vertical mill + hot stove + dust collector + finished product warehouse
Process Description
Piles of slag are taken and fed by the forklift truck and conveyed by a belt conveyor. During the process of conveying, nickel slag raw material will be iron-removing and screening through magnetic separator and vibrating screen, and then go to the weigher cabin, elevator and last to the vertical roller mill for grinding process. The ground nickel slag powder is dried by the hot air supplied by the hot blast furnace, and with the help of hot air, the powder selection is made in the separator. The qualified nickel slag powder particles will be collected by bag dust collector, then conveyed to and stored in the silos by the air slide and elevator.